National Rooftop Program · Ahmedabad, Gujarat
Anupam Solar Technology designs and installs residential rooftop solar systems under the government's National Rooftop Program — from documentation to commissioning.
About Us
Anupam Solar Technology is a rooftop solar EPC provider based in Ahmedabad, working under the Government of India's National Rooftop Program. We handle the full journey for homeowners — consumer registration, feasibility approval, installation, DISCOM meter installation, and subsidy disbursal — so you don't have to chase paperwork across departments.
Every installation uses ISI-standard components: Waaree solar panels, Polycab/Solaryaan inverters, hot-dip galvanized structures, and proper earthing and lightning protection — built to hold up on an Indian rooftop for decades, not just years.
Bill of Materials
No guesswork on components — here's exactly what goes on your roof, down to the cable gauge.
Waaree 615W modules — 30-year performance warranty.
Polycab / Solaryaan — 10-year onsite warranty.
Hot-dip galvanized pipe, 60×40×2mm — Hindustar or ISI standard.
C&S MCBs with Sibaas surge protection devices on both sides.
Polycab / RR 2.5 sq.mm DC and AC cable, UV-protected conduit.
Copper-coated lightning arrestor plus individual AC/DC chemical earthing.
We map panel rows and cabling to your actual roof before anyone climbs up with a drill — orientation, shading, and walkway access all get planned in advance.
Reference layout: 100 modules 56.50 kWp arrayWhy Go Solar
A subsidized rooftop system pays for itself in electricity you stop buying every single month.
Work Flow
An approximate timeline — actual dates depend on your DISCOM's processing speed.
3–5 days to get your paperwork filed and consumer registration submitted.
₹20,000 collected at registration to lock in your slot.
Begins immediately after documentation, if financing is needed.
Roughly 7–10 days, timed to your DISCOM's own schedule.
Collected before structure installation begins on your roof.
Runs in parallel with your DISCOM's approval process.
Approximately 35–40 days for full physical installation.
Once full payment clears, the system is commissioned and your subsidy request is filed — funds typically arrive 45–60 days after meter installation.
Get In Touch
Tell us your monthly bill and roof space — we'll come back with a proposal like this one.